See how we've transformed pools for other clients. 


MARGIE — WINTER SPRINGS

work performed

  • Deck removal

  • Rebuilding of the pool beam

  • Changed the shape of the pool

  • Added a spa with a raised deck area

  • Installation of a sun shelf

  • Installed a sheer descent

  • Replumbed system with new equipment (includes variable speed pump, defilter, automation system, salt system, gas heater and blower)

  • Installed a new skimmer

  • New tile and installation of Pebble-Tec pool finish

  • Installation of brick coping and travertine pavers

  • Installed paver retaining wall

  • Installation of imitation wrought iron fencing and landscaping

 

MARGIE — WINTER SPRINGS

work performed

  • Deck removal

  • Rebuilding of the pool beam

  • Changed the shape of the pool

  • Added a spa with a raised deck area

  • Installation of a sun shelf

  • Installed a sheer descent

  • Replumbed system with new equipment (includes variable speed pump, defilter, automation system, salt system, gas heater and blower)

  • Installed a new skimmer

  • New tile and installation of Pebble-Tec pool finish

  • Installation of brick coping and travertine pavers

  • Installed paver retaining wall

  • Installation of imitation wrought iron fencing and landscaping

 

SHAWN & LORENZO – BAY HILL

work performed

  • Corrected the elevation on the negative edge

  • Installed granite spillway

  • Corrected trough size for negative edge to work properly

  • Added stacked stone to negative edge

  • Structural repairs (drilling and repining)

  • Added a sun shelf

  • Skimmer replacement

  • Prep and installed Pebble-Tec pool finish

  • Tile replacement (retile)

  • Installed travertine coping and pavers

  • Installed new deck drains

  • Installed a fire pit

  • Added stone and landscaping

  • Dewatering

 

JOHN & SHEREE—OVIEDO

WORK PERFORMED

  • Screen removal and replacement

  • Removal of concrete that could not be saved

  • Re-elevating and soil stabilization through pressure grouting

  • Structural repairs (drilling and pinning, crack repair by using steel staples)

  • Skimmer replacement

  • Prep and plaster

  • Tile replacement (re-tile) 

  • Installation of renovation brick coping and pavers

  • Installation of new deck drains

 

ROY & JUDY – OVIEDO

WORK PERFORMED

  • Skimmer replacement

  • Prep and plaster

  • Tile replacement (retile)

  • Installed renovation brick coping and pavers at the proper elevation

  • Replacement of pool equipment (pump, de-filter and pad)

 

CRAIG & KARAN—OCOEE

WORK PERFORMED

  • Screen removal and replacement

  • Soil stabilization through pressure grouting

  • Structural repairs (drilling and pinning, crack repair by using steel staples)

  • Skimmer replacement 

  • Prep and plaster

  • Tile Replacement (retile)

  • Installation of granite spillways

  • Installation of renovation brick coping and pavers

  • Installation of new deck drains

  • Some light landscaping

 

GAYLE & STEVE — LAKE MARY

WORK PREFORMED

  • Installation of travertine pavers and brick coping

  • Equipment replacement

 

RHONDA — ENTERPRISE

WORK PERFORMED

  • Removal of concrete that could not be saved

  • Re-elevating pool deck and stabilizing of pool through pressure grouting

  • Structural repairs (drilling and pinning, crack repair by using steel staples)

  • Skimmer replacement

  • Prep and plaster

  • Tile replacement (retile)

  • Installation of renovation brick coping and pavers

  • Installation of new deck drains

  • Replacement of fencing with vinyl fence

 

CHARLES & EDITH  - ALTAMONTE SPRINGS

WORK PERFORMED

  • Removal of pool deck

  • Rebuilding pool beam

  • Structural repairs (drilling and pinning, crack repair by using steel staples

  • Skimmer replacement

  • Prep and plaster

  • Tile replacement (retile)

  • Installation of brick coping and pavers

  • Installation of new filter and pump

 

ROBERT & GLINDA – OVIEDO

WORK PERFORMED

  • Removal of concreate that could not be saved

  • Installation of faux rock water feature (rico rock)

  • New equipment and pad

  • Prep and plaster

  • Tile replacement (retile)

  • Installation of renovation brick coping and pavers

  • Installation of imitation wrought iron fencing

 

WESLEY – ORLANDO 

WORK PERFORMED

  • Stabilized pool deck through pressure grouting

  • Structural repairs (drilling and pinning)

  • Skimmer replacement

  • Prep and plaster

  • Tile replacement (retile)

  • Installation of renovation brick coping and pavers

  • Installation of new deck drainage system

  • New equipment (pump, filter, salt system)

 

CHARLES & MAE – MAITLAND

work performed

  • Stabilized pool deck through pressure grouting

  • Structural repairs (drilling and pinning)

  • Skimmer replacement

  • Prep and plaster

  • Tile replacement (retile)

  • Installation of renovation brick coping and pavers

  • Installation of new deck drainage system

  • Installation of a new stainless steel ladder

 

WILLIAM & COLLEN – CASSELBERRY

WORK PERFORMED

  • Screen removal and replacement

  • Re-elevating retaining wall and soil stabilization through pressure grouting

  • Structural repairs (drilling and repining, crack repair by using steel staples)

  • Skimmer replacement

  • Installed 3 deck jets

  • Prep and plaster

  • Tile replacement (retile)

  • Installation of renovation brick coping and pavers

  • Installed new deck drains

  • Installed child barrier fencing

 

ROBERT & GAYLE — OVIEDO

work performed

  • Screen removal and replacement

  • Removal of concrete that could not be saved

  • Re-elevating pool deck and pool stabilization through pressure grouting

  • Structural repairs (drilling and repining, crack repair by using steel staples)

  • Skimmer replacement

  • Prep and plaster

  • Tile replacement (retile)

  • New granite spillway

  • Installation of renovation brick coping and pavers

  • Installation of new deck drains

 

JAMES & JACQUELINE – LONGWOOD 

work performed

  • Closed in spa damn walls

  • Glass tile installation

  • New granite spillway

  • Installation of travertine coping and pavers

  • Installation of new deck drains

  • Prep and installed Pebble-Teck pool finish

 

DENNIS & REGINA – OVIEDO

WORK PERFORMED

  • Screen removal and replacement

  • Re-elevating the pool deck and stabilization of the pool through pressure grouting

  • Structural repairs (drilling and repining, crack repair by using steel staples)

  • Skimmer replacement 

  • Installed a raised platform and installed a sheer descent water feature

  • Prep and plaster

  • Tile replacement (retile)

  • Installed renovation brick coping and pavers

  • Installed new deck drains