See how we've transformed pools for other clients.
MARGIE — WINTER SPRINGS
work performed
Deck removal
Rebuilding of the pool beam
Changed the shape of the pool
Added a spa with a raised deck area
Installation of a sun shelf
Installed a sheer descent
Replumbed system with new equipment (includes variable speed pump, defilter, automation system, salt system, gas heater and blower)
Installed a new skimmer
New tile and installation of Pebble-Tec pool finish
Installation of brick coping and travertine pavers
Installed paver retaining wall
Installation of imitation wrought iron fencing and landscaping
MARGIE — WINTER SPRINGS
work performed
Deck removal
Rebuilding of the pool beam
Changed the shape of the pool
Added a spa with a raised deck area
Installation of a sun shelf
Installed a sheer descent
Replumbed system with new equipment (includes variable speed pump, defilter, automation system, salt system, gas heater and blower)
Installed a new skimmer
New tile and installation of Pebble-Tec pool finish
Installation of brick coping and travertine pavers
Installed paver retaining wall
Installation of imitation wrought iron fencing and landscaping
SHAWN & LORENZO – BAY HILL
work performed
Corrected the elevation on the negative edge
Installed granite spillway
Corrected trough size for negative edge to work properly
Added stacked stone to negative edge
Structural repairs (drilling and repining)
Added a sun shelf
Skimmer replacement
Prep and installed Pebble-Tec pool finish
Tile replacement (retile)
Installed travertine coping and pavers
Installed new deck drains
Installed a fire pit
Added stone and landscaping
Dewatering
JOHN & SHEREE—OVIEDO
WORK PERFORMED
Screen removal and replacement
Removal of concrete that could not be saved
Re-elevating and soil stabilization through pressure grouting
Structural repairs (drilling and pinning, crack repair by using steel staples)
Skimmer replacement
Prep and plaster
Tile replacement (re-tile)
Installation of renovation brick coping and pavers
Installation of new deck drains
ROY & JUDY – OVIEDO
WORK PERFORMED
Skimmer replacement
Prep and plaster
Tile replacement (retile)
Installed renovation brick coping and pavers at the proper elevation
Replacement of pool equipment (pump, de-filter and pad)
CRAIG & KARAN—OCOEE
WORK PERFORMED
Screen removal and replacement
Soil stabilization through pressure grouting
Structural repairs (drilling and pinning, crack repair by using steel staples)
Skimmer replacement
Prep and plaster
Tile Replacement (retile)
Installation of granite spillways
Installation of renovation brick coping and pavers
Installation of new deck drains
Some light landscaping
GAYLE & STEVE — LAKE MARY
WORK PREFORMED
Installation of travertine pavers and brick coping
Equipment replacement
RHONDA — ENTERPRISE
WORK PERFORMED
Removal of concrete that could not be saved
Re-elevating pool deck and stabilizing of pool through pressure grouting
Structural repairs (drilling and pinning, crack repair by using steel staples)
Skimmer replacement
Prep and plaster
Tile replacement (retile)
Installation of renovation brick coping and pavers
Installation of new deck drains
Replacement of fencing with vinyl fence
CHARLES & EDITH - ALTAMONTE SPRINGS
WORK PERFORMED
Removal of pool deck
Rebuilding pool beam
Structural repairs (drilling and pinning, crack repair by using steel staples
Skimmer replacement
Prep and plaster
Tile replacement (retile)
Installation of brick coping and pavers
Installation of new filter and pump
ROBERT & GLINDA – OVIEDO
WORK PERFORMED
Removal of concreate that could not be saved
Installation of faux rock water feature (rico rock)
New equipment and pad
Prep and plaster
Tile replacement (retile)
Installation of renovation brick coping and pavers
Installation of imitation wrought iron fencing
WESLEY – ORLANDO
WORK PERFORMED
Stabilized pool deck through pressure grouting
Structural repairs (drilling and pinning)
Skimmer replacement
Prep and plaster
Tile replacement (retile)
Installation of renovation brick coping and pavers
Installation of new deck drainage system
New equipment (pump, filter, salt system)
CHARLES & MAE – MAITLAND
work performed
Stabilized pool deck through pressure grouting
Structural repairs (drilling and pinning)
Skimmer replacement
Prep and plaster
Tile replacement (retile)
Installation of renovation brick coping and pavers
Installation of new deck drainage system
Installation of a new stainless steel ladder
WILLIAM & COLLEN – CASSELBERRY
WORK PERFORMED
Screen removal and replacement
Re-elevating retaining wall and soil stabilization through pressure grouting
Structural repairs (drilling and repining, crack repair by using steel staples)
Skimmer replacement
Installed 3 deck jets
Prep and plaster
Tile replacement (retile)
Installation of renovation brick coping and pavers
Installed new deck drains
Installed child barrier fencing
ROBERT & GAYLE — OVIEDO
work performed
Screen removal and replacement
Removal of concrete that could not be saved
Re-elevating pool deck and pool stabilization through pressure grouting
Structural repairs (drilling and repining, crack repair by using steel staples)
Skimmer replacement
Prep and plaster
Tile replacement (retile)
New granite spillway
Installation of renovation brick coping and pavers
Installation of new deck drains
JAMES & JACQUELINE – LONGWOOD
work performed
Closed in spa damn walls
Glass tile installation
New granite spillway
Installation of travertine coping and pavers
Installation of new deck drains
Prep and installed Pebble-Teck pool finish
DENNIS & REGINA – OVIEDO
WORK PERFORMED
Screen removal and replacement
Re-elevating the pool deck and stabilization of the pool through pressure grouting
Structural repairs (drilling and repining, crack repair by using steel staples)
Skimmer replacement
Installed a raised platform and installed a sheer descent water feature
Prep and plaster
Tile replacement (retile)
Installed renovation brick coping and pavers
Installed new deck drains